Accidents, roadworks and closures — updated in real time.
Between MM 2 and MM 12 (7 to 17 miles south of the Wellington area). Bridge construction work is in progress. Speed limit 65 mph . Width limit 12'0" . Comment: Bridge raising MM 2-12, bridges at 3, 10, and 11.
Between Oklahoma State Line and KS 49 (Caldwell). The roadway is reduced to one lane because of construction work. Be aware of narrow lanes. Width limit 12'0" .
Between MM 23 (4 miles north of the Wellington exit) and MM 127 (Emporia). Look out for construction work. Comment: Increasing drainage capacity MM 24.9, 26.3, 120.77, 127.84, 151, 154.