RoadworksSevere

I-35 in both directions: Construction work.

I-35 in both directions: Between MM 23 and MM 127.

Advertisement
...

Between MM 23 (4 miles north of the Wellington exit) and MM 127 (Emporia). Look out for construction work. Comment: Increasing drainage capacity MM 24.9, 26.3, 120.77, 127.84, 151, 154.

ReportedSeptember 13, 2026 at 10:00 PM PDTJuly 3, 2030 at 07:20 PM PDT
Road
I-35
Source
KDOT
Coordinates
37.33031, -97.33518

Roadworks details

Direction
BOTH_DIRECTIONS

More about I-35

🚧 Roadworks