Accidents, roadworks and closures — updated in real time.
Between KS 18 and KS 41 (1 mile south of the Minneapolis area). Look out for construction work.
Between KS 106 and US 81 (4 miles west of the Bennington area). A lane is closed. Automated traffic signals are in place due to bridge construction work. Until October 30, 2026 at about 11:59PM CDT.