RoadworksModerate
I-70 in both directions: Bridge construction.
Between KS 247 and US 183 Bypass (4 miles east of the Ellis area). Bridge construction work is in progress. The roadway is reduced to one lane. Width limit 13'0" . Until September 18, 2026 at about 11:59PM CDT. Full schedule below: • July 1, 12:00AM - September 18, 12:00AM Comment: Bridges on I-70 in both directions near mile marker 150, 4.2 miles east of Ellis are under construction. Roadway is reduced to one lane. Width restriction is 13 feet. Construction will occur from May 5 to September 18, 2026.