RoadworksModerate
Construction on 97
Beginning Monday, May 18, until further notice: Travelers in both directions of US 97 at Satus Creek Bridge (mileposts 30.54 to 31.23) will take turns using one open lane through the work zone, controlled by a temporary traffic signal 24/7 for work to repair the bridge barriers.