RoadworksSevere
US-26 to US-385 Link in both directions: Construction work.
Between US 26 and US 385. Look out for construction work. A lane is closed intermittently. Width limit 12'0" . Comment: The work on this project is the next phase of the 4-lane Heartland Expressway. Work includes grading, concrete pavement, culverts, bridge construction, lighting, guardrail and seeding.