LiveTrafik
RoadworksSevere

US-26 to US-385 Link in both directions: Construction work.

US-26 to US-385 Link in both directions: Between US 26 and US 385.

...

Between US 26 and US 385. Look out for construction work. A lane is closed intermittently. Width limit 12'0" . Comment: The work on this project is the next phase of the 4-lane Heartland Expressway. Work includes grading, concrete pavement, culverts, bridge construction, lighting, guardrail and seeding.

ReportedJune 8, 2026 at 05:00 AM PDTApril 27, 2030 at 09:08 AM PDT
Road
NE 62A Link
Source
NDOT
Coordinates
41.81653, -103.32539

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US-26 to US-385 Link in both directions: Construction work. | LiveTrafik