RoadworksSevere
NE 61 in both directions: Construction work.
Between US 6 and MM 54 (11 miles north of the Imperial area). Look out for construction work. Milling work is in progress. The roadway is reduced to one lane. A pilot car is in operation. Look out for a flagging operation. Width limit 12'0" . Comment: Work includes milling, asphalt overlay, curb repair and seeding. Anticipated completion is Oct. 2026. More Info: D7 Hwy 6 and Hwy 61.jpg