RoadworksModerate
US 71 in both directions: Road construction.
Between I-80 and IA 44 (2 miles south of the Brayton area). Road construction work is in progress. Look out for temporary traffic lights. There is a height limit in effect . There is a width limit in effect . Height limit 15'0" . Width limit 15'6" . Until September 17, 2026 at about 7:00PM CDT. Full schedule below: • May 11, 7:00AM - September 17, 7:00PM Comment: Creston RCE (877-226-8109) - Audubon County