LiveTrafik
RoadworksModerate

US 71 in both directions: Road construction.

US 71 in both directions: Between I-80 and IA 44.

...

Between I-80 and IA 44 (2 miles south of the Brayton area). Road construction work is in progress. Look out for temporary traffic lights. There is a height limit in effect . There is a width limit in effect . Height limit 15'0" . Width limit 15'6" . Until September 17, 2026 at about 7:00PM CDT. Full schedule below: β€’ May 11, 7:00AM - September 17, 7:00PM Comment: Creston RCE (877-226-8109) - Audubon County

ReportedMay 11, 2026 at 05:00 AM PDTSeptember 17, 2026 at 05:00 PM PDT
Road
US 71
Source
Iowa DOT
Coordinates
41.50562, -94.94344

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 71 in both directions: Road construction. | LiveTrafik