LiveTrafik
HomeAreasRoadsCameras
Live

Traffic in

Accidents, roadworks and closures — updated in real time.

RoadworksModerate

US 63 in both directions: Road construction.

Between County Road J15 and County Road H47 (7 miles south of the Ottumwa area). Road construction work is in progress. Look out for temporary traffic lights. There is a height limit in effect . Height limit 15'0" . Until Tuesday, at about 6:00PM CDT. Full schedule below: • October 14, 8:00AM - October 20, 6:00PM Comment: Chariton RCE (800-881-5778) - Davis County

RoadworksModerate

US 63 in both directions: Road construction.

Between County Road J37 and County Road J15 (2 miles north of the Bloomfield area). Road construction work is in progress. Look out for temporary traffic lights. There is a height limit in effect . There is a width limit in effect . Height limit 15'0" . Width limit 12'5" . Until October 30, 2026 at about 5:00PM CDT. Full schedule below: • April 6, 8:00AM - October 30, 5:00PM Comment: Chariton RCE (800-881-5778) - Davis County

Cameras in Davis County

See all (2)
R81: BloomfieldR81: Bloomfield5BV - US 63 @ MM 19.75 (IWZ 3103)5BV - US 63 @ MM 19.75 (IWZ 3103)
...
LiveTrafik

Weather: forecasts by the NOAA National Blend of Models; current readings by NOAA airport weather stations (aviationweather.gov). Live Trafik is independent and not affiliated with, or endorsed by, NOAA.

HomeContactPrivacy Policy
© 2026 SIRT AB