Accidents, roadworks and closures — updated in real time.
The roadway is reduced to a single lane, with temporary traffic signals and a 11.5-foot width restriction in place.
Lane shifts for construction at the I-70/SR 149 (EXIT 208) interchange improvement project. Two lanes of traffic are maintained with a 12-foot width restriction.
Traffic is maintained with flaggers throughout construction.
Slide repair. Traffic is maintained with temporary traffic signals