Accidents, roadworks and closures — updated in real time.
Bridge rehabilitation project. One lane of traffic maintained throughout construction.
The road is closed for a slide repair. The detour is SR 9 south to SR 147 west, SR 147 west back to SR 149, and reverse.
Lane shifts for construction at the I-70/SR 149 (EXIT 208) interchange improvement project. Two lanes of traffic are maintained with a 12-foot width restriction.
Traffic is maintained with flaggers throughout construction.
Slide repair. Traffic is maintained with temporary traffic signals