Traffic messageModerate
I-70 in both directions (Mile Point 131.05 - 156.2): Width limit in effect.
Between S 375 E (7 miles east of the Spiceland area) and the end of I-70 (near Richmond). There is a width limit in effect . Look out for construction work. Look out for a new road construction layout. Width limit 11'0" . Until December 1, 2026 at about 5:00PM EDT. Comment: -70 in both directions, S 375 E (7 miles east of the Spiceland area) and the end of I-70 (near Richmond). Look out for construction work. Look out for a new road construction layout. Width limit 11'0". Until December 1, 2026 at about 5:00PM EDT.