LiveTrafik
RoadworksSevere

IN 3 in both directions (Mile Point 115.08 - 111.61): Construction work.

IN 3 in both directions: Between Pleasant View Dr and Blue River Rd.

...

Between Pleasant View Dr and Blue River Rd (near New Castle). Look out for construction work. There are alternating lane closures. Look out for a new road layout. There is a width limit in effect . Width limit 10'0" . Until November 27, 2026 at about 8:00PM EDT. Comment: State Road 3 North Bound lanes will be closed from Glenwood Dr to East County Road 300 South. Northbound and Southbound traffic will merge to one lane in both directions on the the Southbound lanes of State Road 3 starting June 8, 2026 until September 1, 2026. There is a 10 foot lane restriction in effect.

ReportedMarch 1, 2026 at 05:00 AM PSTNovember 27, 2026 at 05:00 PM PST
Road
IN 3
Source
INDOT
Coordinates
39.89333, -85.38540

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
IN 3 in both directions (Mile Point 115.08 - 111.61): Construction work. | LiveTrafik