RoadworksSevere
NE 88 in both directions: Bridge construction.
NE 88 in both directions: Between MM 58 and US 385.
...
Between MM 58 and US 385 (Bridgeport). Bridge construction work is in progress. The roadway is reduced to one lane. Portable traffic signals in use. Width limit 12'0" .
ReportedOctober 8, 2026 at 08:21 AM PDTJuly 28, 2030 at 05:44 AM PDT
Road
NE 88
Source
NDOT
Coordinates
41.65701, -103.09948
Roadworks details
Direction
BOTH_DIRECTIONS