RoadworksModerate
IN 67 northbound (Mile Point 95.96 - 94.98): Bridge construction.
IN 67 northbound: Between Charmil Dr and IN 144; IN 42.
...
Between Charmil Dr and IN 144; IN 42 (near Mooresville). Bridge construction work is in progress. Until November 1, 2026 at about 7:00PM EDT. Comment: IN 67 in both directions, between Charmil Dr and IN 42; IN 144 (near Mooresville). Bridge construction work is no longer in progress. SR67 both NB/SB lanes are opened.
ReportedApril 6, 2026 at 04:00 AM PDTNovember 1, 2026 at 04:00 PM PST
Road
IN 67
Source
INDOT
Coordinates
39.59532, -86.37623
Roadworks details
Direction
POSITIVE_DIRECTION