Traffic messageModerate
IN 67 in both directions (Mile Point 95.96 - 94.98): Width limit in effect.
Between Charmil Dr and IN 144; IN 42 (near Mooresville). There is a width limit in effect . Traffic restrictions are in force . Bridge construction work is in progress. Speed limit 35 mph . Width limit 10'0" . Until September 30, 2026 at about 7:00PM EDT. Comment: IN 67 in both directions, between Charmil Dr and IN 42; IN 144 (near Mooresville). There is a width limit in effect. Traffic restrictions are in force. Bridge construction work is in progress. Width limit 10'0". Speed limit 35 MPH. Starting April 6, 2026 at about 7:00AM EST until September 2, 2026 at about 7:00PM EST. SR67 both NB/SB lanes will be restricted to one lane during construction. Be aware of trucks entering and leaving the work zone.