RoadworksSevere
NE 61 in both directions: Construction work.
NE 61 in both directions: Between US 6 and MM 54.
...
Between US 6 and MM 54 (11 miles north of the Imperial area). Look out for construction work. Milling work is in progress. The roadway is reduced to one lane. A pilot car is in operation. Look out for a flagging operation. Width limit 12'0" . Comment: Work includes milling, asphalt overlay, curb repair and seeding. Anticipated completion is Oct. 2026. More Info: D7 Hwy 6 and Hwy 61.jpg
ReportedJuly 13, 2026 at 05:00 AM PDTJune 10, 2030 at 05:19 AM PDT
Road
NE 61
Source
NDOT
Coordinates
40.50728, -101.62882
Roadworks details
Direction
BOTH_DIRECTIONS