LiveTrafik
RoadworksSevere

US 26 in both directions: Bridge construction.

US 26 in both directions: Between 4th Street and US 385.

...

Between 4th Street and US 385 (near Bridgeport). Bridge construction work is in progress. The roadway is reduced to one lane. Portable traffic signals in use. Width limit 12'0" . Speed limit 35 mph . Comment: Work includes bridge repairs, addition of a pedestrian crosswalk equipped with flashing beacons to enhance safety, milling and asphalt overlay.

ReportedMarch 30, 2026 at 03:18 PM PDTJune 2, 2030 at 08:06 AM PDT
Road
US 26
Source
NDOT
Coordinates
41.68179, -103.09368

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks
US 26 in both directions: Bridge construction. | LiveTrafik