LiveTrafik
RoadworksSevere

I-35 in both directions: Bridge construction.

I-35 in both directions: Between MM 1 and MM 12.

...

Between MM 1 and MM 12 (7 to 17 miles south of the Wellington area). Bridge construction work is in progress. Speed limit 65 mph . Width limit 12'0" . Comment: Bridge raising MM 1-12, bridges at 2, 3, 10, and 11.

ReportedSeptember 2, 2026 at 09:05 AM PDTJune 22, 2030 at 06:25 AM PDT
Road
I-35
Source
KDOT
Coordinates
37.01287, -97.33848

Roadworks details

Direction
BOTH_DIRECTIONS
🚧 Roadworks