RoadworksSevere
I-35 in both directions: Bridge construction.
I-35 in both directions: Between MM 2 and MM 12.
...
Between MM 2 and MM 12 (7 to 17 miles south of the Wellington area). Bridge construction work is in progress. Speed limit 65 mph . Width limit 12'0" . Comment: Bridge raising MM 2-12, bridges at 3, 10, and 11.
ReportedOctober 13, 2026 at 10:39 AM PDTAugust 2, 2030 at 07:59 AM PDT
Road
I-35
Source
KDOT
Coordinates
37.02728, -97.33809
Roadworks details
Direction
BOTH_DIRECTIONS