LiveTrafik
Traffic messageModerate

IN 67 in both directions (Mile Point 95.96 - 94.98): Width limit in effect.

IN 67 in both directions: Between Charmil Dr and IN 144; IN 42.

...

Between Charmil Dr and IN 144; IN 42 (near Mooresville). There is a width limit in effect . Traffic restrictions are in force . Bridge construction work is in progress. Speed limit 35 mph . Width limit 10'0" . Until September 30, 2026 at about 7:00PM EDT. Comment: IN 67 in both directions, between Charmil Dr and IN 42; IN 144 (near Mooresville). There is a width limit in effect. Traffic restrictions are in force. Bridge construction work is in progress. Width limit 10'0". Speed limit 35 MPH. Starting April 6, 2026 at about 7:00AM EST until September 2, 2026 at about 7:00PM EST. SR67 both NB/SB lanes will be restricted to one lane during construction. Be aware of trucks entering and leaving the work zone.

ReportedApril 6, 2026 at 04:00 AM PDTSeptember 30, 2026 at 04:00 PM PDT
Road
IN 67
Source
INDOT
Coordinates
39.59532, -86.37623

Roadworks details

Direction
BOTH_DIRECTIONS
⚠️ Traffic message