Accidents, roadworks and closures — updated in real time.
- All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. - Pilot car in use.
- Motorists should expect delays. - Use alternate route CSJ 0086-01-073 For the Reconstruction of SH359
- Motorists should expect delays. - Use alternate route CSJ 0086-01-101 For the Installation of Traffic Signals at Stone Ave & US83. Location #2
- Motorists should expect delays. - Use alternate route CSJ 0086-01-101 For the installation of Traffic Signals at Willow Oaks St & 359. Location #1
- Motorists should expect delays. CSJ: 2150-04-099 Construction of New Right Turn Lanes At Pinto Valle, and Left turn Lane at Existing Crossover
- Motorists should expect delays. CSJ: 2150-04-099Construction of New Right Turn Lanes At Pinto Valle, and Left turn Lane at Existing Crossover
- Motorists should expect delays. - Use alternate route CSJ 0237-03-036 For the Construction of Rehabilitation of existing 2 lane roadway with super 2 passing lanes & Pavement Markings
- Use alternate route CSJ 0086-16-008 For the Construction of Interchange Improvement at Lomas Del Sur Blvd and Installation of Concrete Barrier
- Motorists should expect delays. CSJ 3586-02-007 Rehabilitation of existing road at SH 255
- Motorists should expect delays. CSJ 3586-02-006For the construction of Rehab of existing road