RoadworksModerate
SH-7 — Construction
- Delays due to slow moving road repair operations. - Watch for flag personnel directing traffic. - Follow the marked detour CSJ 0553-03-034 The bridge on SH 7 at Morral Creek is being replaced. Traffic is diverted to a temporary bridge. Slow down, be alert, and use caution.Note the contractor will also be replacing the Morral Bayou bridge on CR 724 and a detour will be in place for CR 724 while the CR 724 bridge is closed.