RoadworksModerate
IN 930 in both directions (Mile Point 146.5 - 147): Bridge construction.
Between Columbia Ave and OLD IN 930 (Fort Wayne). Bridge construction work is in progress. The roadway is reduced to one lane. Speed limit 35 mph . Width limit 13'0" . Until November 30, 2026 at about 2:00PM EDT. Comment: IN 930 in both directions, between Columbia Ave and OLD IN 930 (Fort Wayne). Bridge construction work is in progress. The roadway is reduced to one lane. Starting Monday at 8:00AM EST until November 30, 2026 at about 2:00PM EST.