RoadworksCritical
I-69 (Mile Point 94.16 - 96.78): Bridge maintenance operations.
Between US 231 and Exit 98 (6 to 8 miles north of the Scotland area). Bridge maintenance work is in progress. There are alternating lane closures. Traffic restrictions are in force . Speed limit 60 mph . Width limit 12'0" . Until Tuesday, at about 12:00AM EDT. Comment: I-69 over county road 750E, Dry BR Plumr, 6.90 miles East of US 231 will be reduced to one lane in each direction to perform minor patching and polymeric overlays. A 12' width restriction is in place.