Traffic messageModerate
I-65 in both directions (Mile Point 29.32 - 55.26): Width limit in effect.
Between IN 56 (Scottsburg) and IN 11 (4 miles north of the Seymour area). There is a width limit in effect . There are alternating lane closures due to road construction work. Speed limit 45 mph . Width limit 11'0" . Until October 30, 2026 at about 8:00AM EDT. Comment: I-65 in both directions, between IN 56 (Scottsburg) and IN 11 (4 miles north of the Seymour area). There are alternating lane closures due to road construction work. Starting April 20, 2026 at about 8:00AM EDT until October 30, 2026 at about 8:00AM EDT. Speed is reduced to 45 MPH in worksites. The following lane/ramp closures will be in place August 28 - 31, 2026 from 9:00PM Friday until 6:00AM Monday. Southbound left lane of I-65 will be closed mile marker 38 to mile marker 36. Southbound right lane of I-65 will be closed mile marker 30.5 to mile marker 29. I-65 southbound Exit 29A will be closed. The entrance ramp for I-65 south from westbound SR 56 will also be closed. Detours are in place for both ramps. Northbound right lane of I-65 will be closed from mile marker 35 to mile marker 37.5