RoadworksMinor
CO-157 — Striping Operations
Between Pearl Parkway and CO 119 (near Boulder) from Mile Point 2.92 to Mile Point 4.1. Right lane closed due to striping operations. Starting Sunday at 7:00PM MDT until Monday, at about 7:00AM MDT. Full schedule below: • September 20, 7:00PM - September 21, 7:00AM Comment: AREAS OF ROAD REDUCED TO A SINGLE LANE. INTERMITTENT ON AND OFF RAMP CLOSURES AT PEARL STREET & CO 119 EXITS.