RoadworksSevere
I-80 Toll eastbound: Road construction.
I-80 Toll eastbound: Between IN 331 and IN 19.
...
Between IN 331 and IN 19 (Granger). A Waze user reported road construction.
ReportedOctober 18, 2026 at 10:10 AM PDTAugust 7, 2030 at 07:31 AM PDT
Road
I-80 Toll
Source
INDOT
Coordinates
41.73116, -86.07309
Roadworks details
Direction
POSITIVE_DIRECTION