RoadworksSevere

BI-27U β€” Construction

FM3466 to US0070

...

- All traffic reduced to one lane, two-way traffic control in place, be prepared to stop. - Lanes closed to traffic, detour in place. - Travel lanes reduced to one lane. bridge repair in progress-traffic control in place-be prepared to stop, four way stop in place.

ReportedOctober 12, 2026 at 08:10 AM PDTJanuary 31, 2027 at 04:00 PM PST
Road
BI-27U
Source
state DOT open data
Coordinates
34.17829, -101.70681

Roadworks details

Direction
southbound
🚧 Roadworks
BI-27U β€” Construction | LiveTrafik