RoadworksModerate
IA 78 in both directions: Road construction.
IA 78 in both directions: Between IA 149 and IA 1.
...
Between IA 149 (10 miles west of the Richland area) and IA 1 (near Richland). Road construction work is in progress. A lane is closed intermittently. A pilot car is in operation. Look out for flaggers. Until October 29, 2026 at about 1:00PM CDT. Full schedule below: β’ October 12, 7:00AM - October 29, 1:00PM Comment: Fairfield RCE (641-469-4090) - Keokuk County
ReportedOctober 12, 2026 at 05:00 AM PDTOctober 29, 2026 at 11:00 AM PDT
Road
IA 78
Source
Iowa DOT
Coordinates
41.17707, -92.20879
Roadworks details
Direction
BOTH_DIRECTIONS