LiveTrafik
RoadworksModerate

I-94 westbound (Mile Point 35.4 - 33.6): Construction work.

I-94 westbound: Between Gruenke Rd and County Line Rd.

...

Between Gruenke Rd (1 mile east of the Michigan City area) and County Line Rd (1 mile west of the Michigan City area). Look out for construction work. The roadway is reduced to two lanes. Right lane closed in the westbound direction of travel. Until October 25, 2026 at about 5:00AM CDT. Comment: Lane width 11'. US 421 exit ramps open. Wall on both sides.

ReportedOctober 12, 2026 at 03:00 AM PDTOctober 25, 2026 at 03:00 AM PDT
Road
I-94
Source
INDOT
Coordinates
41.65830, -86.91302

Roadworks details

Direction
NEGATIVE_DIRECTION

More about I-94

🚧 Roadworks
I-94 westbound (Mile Point 35.4 - 33.6): Construction work. | LiveTrafik