LiveTrafik
RoadworksModerate

I-94 eastbound (Mile Point 33.6 - 35.4): Construction work.

I-94 eastbound: Between County Line Rd and Gruenke Rd.

...

Between County Line Rd (1 mile west of the Michigan City area) and Gruenke Rd (1 mile east of the Michigan City area). Look out for construction work. The roadway is reduced to two lanes. Height limit 15'7" . Right lane closed in the eastbound direction of travel. Until October 25, 2026 at about 6:00AM CDT. Comment: Lane widths are 11'. US 421 exits are open. Wall on both sides.

ReportedOctober 11, 2026 at 04:00 AM PDTOctober 25, 2026 at 04:00 AM PDT
Road
I-94
Source
INDOT
Coordinates
41.65830, -86.91302

Roadworks details

Direction
POSITIVE_DIRECTION

More about I-94

🚧 Roadworks
I-94 eastbound (Mile Point 33.6 - 35.4): Construction work. | LiveTrafik