RoadworksCritical
IN 14 in both directions (Mile Point 86.42 - 87.07): Bridge construction.
IN 14 in both directions: Between S 450 W and Bouse Dr.
...
Between S 450 W and Bouse Dr (near Silver Lake). Bridge construction work is in progress. A lane is closed. The shoulder is closed. Construction traffic may be merging. Until November 30, 2026 at about 2:00PM EDT. Comment: IN 14 in both directions (Mile Point 86.42 - 87.07): Bridge construction. Between S 450 W and Bouse Dr (near Silver Lake). Bridge construction. Lane closed. Shoulder closed. Construction traffic merging.
ReportedOctober 12, 2026 at 03:00 AM PDTNovember 30, 2026 at 11:00 AM PST
Road
IN 14
Source
INDOT
Coordinates
41.07148, -85.91688
Roadworks details
Direction
BOTH_DIRECTIONS