Traffic messageModerate
IN 25 (Mile Point 50.19 - 50.64): Width limit in effect.
IN 25: Between N 1000 E and N 1100 E.
...
Between N 1000 E (1 mile east of the Colburn area) and N 1100 E (2 miles west of the Delphi area). There is a width limit in effect . Width limit 12'0" . Until May 30, 2027 at about 1:00AM EDT. Comment: Traffic Alert: SR 25 MSE Wall Repair in Tippecanoe County The Indiana Department of Transportation (INDOT) will conduct repairs to the Mechanically Stabilized Earth (MSE) wall on SR 25 over the Norfolk Southern Railroad, approximately 11.1 miles north of I-65 between US 421 and I-65 in Tippecanoe County. During construction, the following traffic restrictions will be in place: The eastbound outside right lane and shoulder will be closed. The inside left lane will remain open to traffic.
ReportedOctober 12, 2026 at 03:00 AM PDTMay 29, 2027 at 10:00 PM PDT
Road
IN 25
Source
INDOT
Coordinates
40.54780, -86.70308