RoadworksModerate

US 52 (Mile Point 77.53 - 78.7): Road construction.

US 52: Between W 400 N and Hazel Rigg Rd.

...

Between W 400 N and Hazel Rigg Rd (1 mile west of the Lebanon area). Road construction work is in progress. Until October 31, 2026 at about 10:00PM EDT. Comment: US 52, between W 400 N (2 miles west of the Lebanon area) and Hazel Rigg Rd (near Lebanon). All lanes are blocked. Road construction work is in progress. See map for detour(s). Starting July 6, 2026 at about 5:00AM EDT until October 31, 2026 at about 10:00PM EDT.

ReportedJuly 20, 2026 at 02:00 AM PDTOctober 31, 2026 at 07:00 PM PDT
Road
US 52
Source
INDOT
Coordinates
40.08906, -86.52026

Roadworks details

Direction
NOT_DIRECTIONAL

More about US 52

🚧 Roadworks