Minor Road work on US-395 Northbound from Dandini Blvd to Golden Valley Road. Start time: 10/1/2026 8:00 PM. End time: 10/31/2026 8:00 PM. Public Details: Northbound lanes will be periodically reduced to one or two lanes from McCarran Blvd Interchange to the Golden Valley Road between the hours of 9:00pm and 5:00am, when needed for construction. Lanes are reduced to 11' travel lanes and the speed limit is reduced to 55mph, 24 hours a day, 7 days a week.. Width Restriction: 14ft Speed Restriction: 55mph
ReportedOctober 1, 2026 at 08:00 PM PDTOctober 31, 2026 at 08:00 PM PDT
Road
US-395
Source
state DOT open data
Coordinates
39.57408, -119.80838
Roadworks details
Direction
North
Period & times
Validity period
Daily, all dayMore about US-395