LiveTrafik
RoadworksModerate

IN 25 eastbound (Mile Point 50.19 - 50.64): Bridge construction.

IN 25 eastbound: Between N 1000 E and N 1100 E.

...

Between N 1000 E (1 mile east of the Colburn area) and N 1100 E (2 miles west of the Delphi area). Bridge construction work is in progress because of construction work and because the right lane is closed to traffic and because the right shoulder is closed to traffic. Width limit 12'0" . Right lane closed in the eastbound direction of travel. Until May 30, 2027 at about 1:00AM EDT. Comment: Traffic Alert: SR 25 MSE Wall Repair in Tippecanoe County The Indiana Department of Transportation (INDOT) will conduct repairs to the Mechanically Stabilized Earth (MSE) wall on SR 25 over the Norfolk Southern Railroad, approximately 11.1 miles north of I-65 between US 421 and I-65 in Tippecanoe County. During construction, the following traffic restrictions will be in place: The eastbound outside right lane and shoulder will be closed. The inside left lane will remain open to traffic. All restrictions are weather dependent, and work schedules may change if adverse weather conditions are forecast. Motorists are encouraged to use caution when traveling through the work zone, reduce speeds, and follow all posted signage. For questions or to report concerns, please contact INDOT Customer Service at 855-INDOT4U (855-463-6848).

ReportedOctober 12, 2026 at 03:00 AM PDTMay 29, 2027 at 10:00 PM PDT
Road
IN 25
Source
INDOT
Coordinates
40.54780, -86.70308

Roadworks details

Direction
POSITIVE_DIRECTION

More about IN 25

🚧 Roadworks
IN 25 eastbound (Mile Point 50.19 - 50.64): Bridge construction. | LiveTrafik