RoadworksModerate
MN 7 eastbound: Construction work.
MN 7 eastbound: At MN 15; MN 22.
...
At MN 15; MN 22 (Hutchinson). Look out for construction work. Right lane closed in the eastbound direction of travel. Until November 9, 2026 at about 5:00PM CDT.
ReportedOctober 5, 2026 at 05:30 AM PDTNovember 9, 2026 at 03:00 PM PST
Road
MN 7
Source
MnDOT
Coordinates
44.89656, -94.36924
Roadworks details
Direction
POSITIVE_DIRECTION