LiveTrafik
RoadworksModerate

US 231 (Mile Point 109.22 - 110.92): Construction work.

US 231: Between CR 50 E and Farmers Rd.

...

Between CR 50 E and Farmers Rd (4 to 5 miles north of the Worthington area). Look out for construction work. The roadway is reduced to one lane. Look out for temporary traffic lights. Until October 28, 2026 at about 5:00PM EDT. Comment: US231/SR 67 will be reduced to one lane for a box culvert rehabilitation, located 4.50 miles North of state road 157 . Temporary traffic lights will control the flow of traffic.

ReportedOctober 5, 2026 at 04:00 AM PDTOctober 28, 2026 at 02:00 PM PDT
Road
US 231
Source
INDOT
Coordinates
39.16560, -86.92060

Roadworks details

Direction
NOT_DIRECTIONAL

More about US 231

🚧 Roadworks