RoadworksModerate
I-94 in both directions (Mile Point 29.6 - 33.6): Construction work.
I-94 in both directions: Between N 250 E and US 421.
...
Between N 250 E (3 miles east of the Chesterton area) and US 421 (1 mile west of the Michigan City area). Look out for construction work. The roadway is reduced to two lanes. Left lane closed in both directions of travel. Until October 25, 2026 at about 5:00AM CDT.
ReportedOctober 9, 2026 at 03:00 AM PDTOctober 25, 2026 at 03:00 AM PDT
Road
I-94
Source
INDOT
Coordinates
41.64757, -86.98564
Roadworks details
Direction
BOTH_DIRECTIONS