RoadworksModerate
IN 14 (Mile Point 102.38 - 103.19): Bridge maintenance operations.
IN 14: Between IN 105; IN 5 and S 600 W.
...
Between IN 105; IN 5 and S 600 W (near South Whitley). Bridge maintenance work is in progress. Expect single line traffic alternating directions. Until December 11, 2026 at about 2:00PM EDT. Comment: IN 14 (Mile Point 102.38 - 103.19): Bridge maintenance operations. Between IN 105; IN 5 and S 600 W (near South Whitley). Bridge maintenance operations. Single line traffic - alternating directions. Starting October 12, 2026 at 6:00AM EDT until December 11, 2026 at about 2:00PM EDT.
ReportedOctober 12, 2026 at 03:00 AM PDTDecember 11, 2026 at 11:00 AM PST
Road
IN 14
Source
INDOT
Coordinates
41.07533, -85.62155
Roadworks details
Direction
NOT_DIRECTIONAL