RoadworksModerate
IN 14 (Mile Point 86.42 - 87.07): Bridge maintenance operations.
IN 14: Between S 450 W and Bouse Dr.
...
Between S 450 W and Bouse Dr (near Silver Lake). Bridge maintenance work is in progress. A lane is closed intermittently. Until November 13, 2026 at about 2:00PM EDT. Comment: Between S 450 W and Bouse Dr (near Silver Lake). Bridge maintenance operations. Intermittent lane closure. Starting October 5, 2026 at 6:00AM EDT until November 13, 2026 at about 2:00PM EDT.
ReportedOctober 5, 2026 at 03:00 AM PDTNovember 13, 2026 at 11:00 AM PST
Road
IN 14
Source
INDOT
Coordinates
41.07148, -85.91688
Roadworks details
Direction
NOT_DIRECTIONAL