RoadworksModerate

US-85 — Culvert Maintenance

Advertisement
...

Between Factory Shops Boulevard and Castlegate Drive (Castle Rock) from Mile Point 185 to Mile Point 186. Culvert maintenance operations. Alternating traffic. Starting Friday at 7:00AM MDT until Friday, at about 7:00PM MDT. Full schedule below: • September 18, 7:00AM - September 18, 7:00PM Comment: Delays of up to 15 minutes are anticipated. The speed limit will be reduced to 15 mph through the work zone. Loads wider than 11 feet will be restricted through the work zone. More project information is available at 720-513-9820 or [email protected].

ReportedSeptember 18, 2026 at 06:00 AM PDTSeptember 18, 2026 at 06:00 PM PDT
Road
US-85
Source
state DOT open data
Coordinates
39.40999, -104.87331

Roadworks details

Direction
north

More about US-85

🚧 Roadworks