RoadworksModerate
US-6 — Bridge Construction
Advertisement
...
Between County Road 41 and County Road 43 (near Holyoke) at Mile Point 456. Bridge construction. Alternating traffic. Starting Friday at 5:00AM MDT until October 30, 2026 at about 7:00PM MDT. Full schedule below: • July 24, 5:00AM - October 30, 7:00PM Comment: Traffic will shift to a 24/7 shoo-fly detour with two lanes of traffic maintained through the work zone, allowing motorists to bypass active construction areas during bridge construction. A 73.5-foot length restriction will be in place.
ReportedJuly 24, 2026 at 04:00 AM PDTOctober 30, 2026 at 06:00 PM PDT
Road
US-6
Source
state DOT open data
Coordinates
40.58570, -102.26493
Roadworks details
Direction
east