RoadworksModerate

US-550 — Road Construction

Advertisement
...

Between County Road 18 and Amphitheatre Road (1 mile south of the Ouray area) from Mile Point 90 to Mile Point 90.2. Road construction. Alternating traffic. Starting today at 12:00PM MDT until today at about 11:59PM MDT. Full schedule below: • September 15, 12:00PM - September 15, 11:59PM Comment: An emergency embankment stabilization project is underway and motorists will encounter 24/7 single-lane alternating traffic and up to 20-minute delays guided by temporary traffic signals through Saturday, September 19.

ReportedSeptember 15, 2026 at 11:00 AM PDTSeptember 15, 2026 at 10:59 PM PDT
Road
US-550
Source
state DOT open data
Coordinates
37.99605, -107.65758

Roadworks details

Direction
north
🚧 Roadworks