LiveTrafik
RoadworksSevere

IN 62 (Mile Point 0.01 - 0.58): Bridge construction.

IN 62: Between the start of IN 62 and W Herman Island Rd.

...

Between the start of IN 62 and W Herman Island Rd (5 miles west of the Mount Vernon area). Bridge construction work is in progress. A lane is closed. Look out for temporary traffic lights. Traffic restrictions are in force . Be aware of narrow lanes. Expect single line traffic alternating directions. Height limit 14'6" . Width limit 10'0" . Speed limit 35 mph . Until January 27, 2027 at about 11:00PM CDT. Comment: The Eastbound lane over the Wabash river will be closed. Eastbound traffic will be diverted to the Westbound lane. There will be single lane traffic utilizing the Westbound lane with temporary traffic lights controlling the flow of traffic. A 10' width restriction and 14'6" height restriction in place.

ReportedSeptember 28, 2026 at 03:00 AM PDTJanuary 27, 2027 at 09:00 PM PST
Road
IN 62
Source
INDOT
Coordinates
37.94427, -88.02153

Roadworks details

Direction
NOT_DIRECTIONAL

More about IN 62

🚧 Roadworks