LiveTrafik
RoadworksModerate

US 20 in both directions (Mile Point 92.11 - 92.9): Bridge construction.

US 20 in both directions: Between CR 9 and US 33; OLD US 33.

Advertisement
...

Between CR 9 and US 33; OLD US 33 (near Elkhart). Bridge construction work is in progress. There are alternating lane closures. Until September 25, 2026 at about 6:00PM EDT.

ReportedSeptember 14, 2026 at 04:00 AM PDTSeptember 25, 2026 at 03:00 PM PDT
Road
US 20
Source
INDOT
Coordinates
41.64509, -85.95565

Roadworks details

Direction
BOTH_DIRECTIONS

More about US 20

🚧 Roadworks
US 20 in both directions (Mile Point 92.11 - 92.9): Bridge construction. | LiveTrafik