RoadworksCritical
IN 16 in both directions (Mile Point 28.98 - 28.79): Utility work.
IN 16 in both directions: Between N Walnut St and Maple Shields.
Advertisement
...
Between N Walnut St and Maple Shields (Monon). Utility work is in progress. All lanes are slow in both directions of travel. Until September 25, 2026 at about 5:00PM EDT.
ReportedSeptember 10, 2026 at 06:00 AM PDTSeptember 25, 2026 at 02:00 PM PDT
Road
IN 16
Source
INDOT
Coordinates
40.86811, -86.88583
Roadworks details
Direction
BOTH_DIRECTIONS