RoadworksModerate
US 52 (Mile Point 154.38 - 154.25): Road construction.
US 52: Between Cummins Rd and Cliff St.
...
Between Cummins Rd and Cliff St (near Brookville). Road construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Until November 20, 2026 at about 11:59PM EDT. Comment: Between Cliff St and Butler's Run Creek (near Brookville). Road construction work is in progress. The roadway is reduced to one lane with Temporary traffic lights in use. The project is a storm drain repair / replacement in the WB lane.
ReportedOctober 12, 2026 at 04:30 AM PDTNovember 20, 2026 at 08:59 PM PST
Road
US 52
Source
INDOT
Coordinates
39.42879, -85.01630
Roadworks details
Direction
NOT_DIRECTIONAL