RoadworksMinor
Road construction on Snake River Ave
Snake River Ave
...
Road construction on Snake River Ave Both Directions from Snake River Grade to Southway Bridge. Lane Intermittent. 8/17/2026 6:00 AM to 10/30/2026 7:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Activities: Consider Alternative Route.
ReportedAugust 17, 2026 at 06:00 AM MDTOctober 30, 2026 at 07:00 PM MDT
Road
Snake River Ave
Source
state DOT open data
Coordinates
46.41898, -117.03237
Roadworks details
Direction
Both
Period & times
Validity period
Daily, all day