RoadworksMinor

Road construction on Snake River Ave

Snake River Ave

...

Road construction on Snake River Ave Both Directions from Snake River Grade to Southway Bridge. Lane Intermittent. 8/17/2026 6:00 AM to 10/30/2026 7:00 PM Mon, Tue, Wed, Thu, Fri, Sat, Sun: Active all day Activities: Consider Alternative Route.

ReportedAugust 17, 2026 at 06:00 AM MDTOctober 30, 2026 at 07:00 PM MDT
Road
Snake River Ave
Source
state DOT open data
Coordinates
46.41898, -117.03237

Roadworks details

Direction
Both

Period & times

Validity period
Daily, all day
🚧 Roadworks
Road construction on Snake River Ave | LiveTrafik